We Read The Winds.

China Regulatory Intelligence
authority2026-09-30

China’s National Energy Administration Seeks Public Comments on Draft Power Grid-Connection Management Rules

国家能源局综合司关于公开征求《电力并网运行管理规定》(征求意见稿)意见的通知

central energy comment-deadline

Issuing authority
国家能源局 (National Energy Administration)
Document type
rule
Publication date
2026-09-30

What happened

The National Energy Administration (国家能源局), through its General Office, has published the 《国家能源局综合司关于公开征求《电力并网运行管理规定》(征求意见稿)意见的通知》 to solicit public feedback on a draft revision of the 《电力并网运行管理规定》. source The draft, titled 《电力并网运行管理规定(征求意见稿)》, updates the existing rules originally issued as State Energy Administration Regulation [2021] No. 60 to standardize power system grid-connection operation management and safeguard the lawful rights and interests of relevant market participants. source Interested parties may submit comments by fax to 010-81929559 or by email to jianguanerchu@nea.gov.cn within 30 days from the 30 September 2026 publication date. source

Who is affected

Central-level energy sector participants—including power generators, grid operators, and other market participants with grid-connected assets in China—are directly affected by the proposed 《电力并网运行管理规定》 revision, which the National Energy Administration drafted to regulate grid-connection operation management and protect the lawful rights and interests of relevant market participants. source

What to do

Key dates

Sources